Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Fabrication and installation of vanes, valve slots
Repairing, maintaining 41MW Steam turbine
Cleaning, welding for leak sealing of equipment E04504
Online leaking sealing for valve body 3" class #2500
Supply of equipment, piping flange re-surfacing services