Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Installing bucket elevator, fans - Line 3
Online leak sealing at 0.75-inch water stagnant discharge line
Repair of circulating pump, coal mill
Online leak sealing of water supply line to boiler A
Heat exchanger flanges re-surfacing